How To Fix MD425 - &1 : &2 (P2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 425

  • Message text: &1 : &2 (P2)

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The system could not find a valid routing when scheduling via the
    routing or the routing is incorrect.

    Réponse du système

    This exception is displayed in the MRP list and the current
    stock/requirements list.

    Comment corriger cette erreur?

    Check the routing for all the scheduling levels set in Customizing.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP MD425 - &1 : &2 (P2) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:
  • MD424 &1 : &2 (P1)
    Quelle est la cause de ce problème? The scheduling data in the Customizing settings are not consistent for the material. Possible reasons, for exam...

  • MD423 &1 : &2 (U5)
    Quelle est la cause de ce problème? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.Ré...

  • MD426 &1 : &2 (P3)
    Quelle est la cause de ce problème? In Customizing, no specification has been made to allow the adjustment of the order start date to the productio...

  • MD427 &1 : &2 (P4)
    Quelle est la cause de ce problème? The production finish date calculated using the routing lies after the order finish date that was calculated us...

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author