Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 409
Message text: &1 : &2 (S3)
No valid run schedule header could be selected for the planned order
(run schedule quantity) of a material that is planned in repetitive
manufacturing.
No run schedule header is assigned.
This exception is set in the MRP list.
Check the validity of the run schedule headers for material and
production version.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
MD409
- &1 : &2 (S3) ?Get instant SAP help. Start your 7-day free trial now.
MD408
&1 : &2 (S2)
Quelle est la cause de ce problème? No valid BOM could be selected for the planned order.Réponse du système BOM explosion cannot be executed. Th...
MD407
&1: &2 (S1)
Quelle est la cause de ce problème? No BOM exists for the material or for the sales order for the process with sales order BOM.Réponse du système...
MD410
&1 : &2 (S6)
Quelle est la cause de ce problème? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part...
MD411
&1 : &2 (S7)
Quelle est la cause de ce problème? In the MRP list, this exception message is set if an shortage occurs within the planning time fence for a mater...
Cliquez sur ce lien pour rechercher tous les messages SAP.