Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 102
Message text: Imputation d'activité non prévue pour le processus de gestion &
Business process &v1& is not supported for activity allocation.
The business process cannot participate in activity allocation in
period(s) &v2&.
If needed, maintain the following in <DS:TRAN.CP02>master data
maintenance</> (tab "allocation"): the
<DS:GLOS.36C0429B3E0C535AE10000009B38F985>process driver</>, and the
<DS:GLOS.35C5721770BF6B31E10000009B38F9B6>allocation type.</>
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KW102
- Imputation d'activité non prévue pour le processus de gestion & ?Get instant SAP help. Start your 7-day free trial now.
KW101
Composante Activity-Based Costing non active
Quelle est la cause de ce problème? The Activity-Based Costing (CO-ABC) component is not active for controlling area <ZH>&V2&</>...
KW100
**** Messages CO-ABC Répartitions
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
KW103
Les rapports d'imputation comportent des cycles
Quelle est la cause de ce problème? With the explosion of the process structures, the system found allocation relationships containing loops. The e...
KW104
Le récepteur & n'a pas de quantité réelle ou planifiée
Quelle est la cause de ce problème? No actual or planned quantity could be determined for value type &V3& for receiver object &V1& ...
Cliquez sur ce lien pour rechercher tous les messages SAP.