How To Fix KW101 - Composante Activity-Based Costing non active


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KW - CO-ABC Activity-Based Costing

  • Message number: 101

  • Message text: Composante Activity-Based Costing non active

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The Activity-Based Costing (CO-ABC) component is not active for
    controlling area <ZH>&V2&</> and fiscal year <ZH>&V1&</>.

    Réponse du système

    No Activity-Based Costing function can be performed

    Comment corriger cette erreur?

    Check whether the required controlling area is set correctly.
    Check whether the controlling area is defined correctly:
    If required, activate the Activity-Based Costing component in the
    'control indicators' of the controlling area for the fiscal year in
    question.
    Is the fiscal year or are the fiscal years defined for the controlling
    area at all?
    Does the controlling area have a standard hierarchy for business
    processes?
    Maintain the components for controlling area &V2& for fiscal year &V1&.
    Start planning again.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP KW101 - Composante Activity-Based Costing non active ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author