Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 173
Message text: Pas de calcul du coût de revient pour le projet &
The system is attempting to determine the target costs on the basis of a
cost estimate for the project.
If you are using a valuated project stock, you can do the following on
the basis of these target costs:
Valuate work in process (WIP) at target costs
Valuate confirmed scrap quantities
Determine variances between the target costs and the actual costs
In the WIP calculation process, the system then attempts to valuate the
work in process on the basis of a project cost estimate if you have
specified in the <LS>valuation variant for work in process and scrap</>
that valuation should be made on the basis of the current standard cost
estimate and if a valuation strategy is defined in the requirements
class that causes the standard price of the valuated project stock to be
determined on the basis of the project cost estimate.
When it calculates the variances, the system attempts to valuate the
confirmed scrap quantities on the basis of a project cost estimate if
you have specified in the <LS>valuation variant for work in process and
scrap</> that the valuation should be made on the basis of the current
standard cost estimate and if a valuation strategy is defined in the
requirements class that causes the standard price of the valuated
project stock to be calculated on the basis of the project cost e
stimate. Another requirement is that the <LS>Scrap</> indicator be set
in the variance key.
When it calculates the variances, the system attempts to valuate the
total variance on the basis of the project cost estimate if it has been
specified in the target cost version that the target costs are to be
calculated on the basis of a current standard cost estimate and if a
valuation strategy has been defined in the requirements class that
causes the standard price of the valuated project stock to be calculated
on the basis of the project cost estimate.
The system cannot find a project cost estimate for the project. This
could be caused by any of the following reasons:
The cost estimate does not exist.
The cost estimate is not valid on the appropriate date.
The cost estimate does not have an itemization.
Note that you can only valuate work in process and scrap at target costs
using a product cost estimate with quantity structure. A unit cost
estimate cannot be used to valuate work in process and scrap.
The system cannot calculate any target costs.
Check the following in Customizing:
The valuation variant for work in process and scrap
The target cost version
The requirements class
If necessary, change the settings in these Customizing steps, or create
a cost estimate for the project.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KV173
- Pas de calcul du coût de revient pour le projet & ?Get instant SAP help. Start your 7-day free trial now.
KV172
Calcul du coût de revient non présent pour commande client & &
Quelle est la cause de ce problème? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are ...
KV171
Pas de CCR. Article/division/vers.CCR/var.CCR/date : & & & &.
Quelle est la cause de ce problème? The system is attempting to calculate target costs for the following purposes: To valuate work in process To va...
KV174
Objet de référence & non autorisé
Quelle est la cause de ce problème? No target costs can be calculated on the basis of this cost estimate. For the valuation of <DS:GLOS.3526B774...
KV175
Pas de gamme opératoire/recette de base pour l'ordre
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.