Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 171
Message text: Pas de CCR. Article/division/vers.CCR/var.CCR/date : & & & &.
The system is attempting to calculate target costs for the following
purposes:
To valuate work in process
To valuate unplanned scrap in variance calculation
To be able to assign the variances to variance categories
No target costs can be calculated because the cost estimate used in
target cost calculation could not be found. Possible reasons:
The cost estimate does not exist.
The cost estimate is not in the relevant costing variant.
The cost estimate not valid
Work in process and variances for product cost collectors are calculated
separately in each period. The cost estimate must be valid on the last
day of the period.
The cost estimate was not saved as an itemization.
Note that you can only valuate work in process and scrap at target costs
using a product cost estimate with quantity structure. A unit cost
estimate cannot be used to valuate work in process and scrap.
The system cannot execute the required function.
Check the appropriate data depending on the selected function:
The target cost versions
The <LS>valuation variant for work in process and scrap</>
Check whether the cost estimate relevant for target cost calculation
exists. For information on the existing cost estimates, see the <LS>
Product Cost Controlling Information System</>.
Check the validity dates of the cost estimate.
<DS:TRAN.CK13N>Proceed</>
Create a new cost estimate for the material, and save the cost estimate
in itemized form by turning on the <LS>Itemization</> field in the <LS>
Update parameters</> dialog box.
<DS:TRAN.MF30>Proceed</>
Calculate the WIP or variances again.
If you are working in reporting, select a report that does not refer to
the target costs.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KV171
- Pas de CCR. Article/division/vers.CCR/var.CCR/date : & & & &. ?Get instant SAP help. Start your 7-day free trial now.
KV170
Pas de CCR. article/division/vers. fabr./var. CCR/date: & & & &
Quelle est la cause de ce problème? You are using a function that calculates target costs using the preliminary cost estimate for the product cost ...
KV169
Aucun cts théor. car pas de prix déterminable pour l'art. & & dans dev. &
Quelle est la cause de ce problème? Because the company code currency is not the same as the controlling area currency, the system is attempting to...
KV172
Calcul du coût de revient non présent pour commande client & &
Quelle est la cause de ce problème? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are ...
KV173
Pas de calcul du coût de revient pour le projet &
Quelle est la cause de ce problème? The system is attempting to determine the target costs on the basis of a cost estimate for the project. If you ...
Cliquez sur ce lien pour rechercher tous les messages SAP.