Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 251
Message text: Centre & type d'activité & : coûts en dépit activité nulle
The plan and posted activity for cost center &V1&, activity type &V2&
is 0. However, costs were planned or posted.
The SAP System cannot calculate activity prices as this would involve
division by zero. The plan costs are ignored in activity price
calculation.
Check plan activity price planning for activity type &V2&, cost center
&V1&, period(s) &V3&, and costs planned on the cost center.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP17>Primary Cost Planning</>
For actual activity price calculation, actual costs are allocated onto
the activity type by splitting, although no actual activity posting has
been made to this activity type.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KP251
- Centre & type d'activité & : coûts en dépit activité nulle ?Get instant SAP help. Start your 7-day free trial now.
KP250
Centre & type d'activité & : coûts en dépit activité nulle
Quelle est la cause de ce problème? The plan or actual activity for cost center &V1&, activity type &V2& is 0. However, costs were ...
KP249
Paramétrages pour &2 sauvegardés
Quelle est la cause de ce problème? Your settings for &V2& have been saved for controlling area &V1&.Réponse du système When car...
KP252
Centre & type d'activité &: référ.à activ.pour activité nulle
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Répo...
KP253
Centre & type d'activité &: référ.à activ.pour activité nulle
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...
Cliquez sur ce lien pour rechercher tous les messages SAP.