How To Fix KP250 - Centre & type d'activité & : coûts en dépit activité nulle


KP250 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 250

  • Message text: Centre & type d'activité & : coûts en dépit activité nulle

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The plan or actual activity for cost center &V1&, activity type &V2& is
    0. However, costs were planned or posted in period(s) &V3&.

    Réponse du système

    The SAP System cannot calculate activity prices for this activity type
    as this would involve division by zero. The plan or actual costs are
    ignored in activity price calculation.

    Comment corriger cette erreur?

    Check activity price calculation in planning for activity type &V2& in
    cost center &V1& and the costs planned for period(s) &V3&.
    <DS:TRAN.KP26>Activity Type Planning</>
    <DS:TRAN.KP06>Primary Cost Planning</>
    For activity price calculation in actual, actual costs are allocated
    onto the activity type through splitting, although no activity posting
    was made on this activity type.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP KP250 - Centre & type d'activité & : coûts en dépit activité nulle ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant