Message type: E = Error
Message class: GM - Combination manager
Message number: 091
Message text: Nature comptable secondaire & ne peut être budgétée sur centre &
The cost element &V1& has a secondary cost element type.
The cost center &V2& to be planned is blocked against the planning of
secondary costs. The block was made in the master record of this cost
center for period(s) &V3&.
Either do not plan the cost center/cost element combination
&V2&/&V1&, or
Shorten the planning period so that cost center &V2& is open for
secondary cost planning in the new period, or
Arrange for the block to be removed.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
GM091
- Nature comptable secondaire & ne peut être budgétée sur centre & ?Get instant SAP help. Start your 7-day free trial now.
GM090
Nature comptable primaire & ne peut être budgétée sur centre &
Quelle est la cause de ce problème? The cost element &V1& you want to plan has a primary cost element type. The cost center &V2& to...
GM089
Pour budgétisation manuelle, nature comptable décompte & non prévue
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
GM092
Nature produit & ne peut être budgétée sur centre &
Quelle est la cause de ce problème? The cost center &V2& to be planned is blocked against revenue planning. The block was made in the maste...
GM093
Dans domaine & / &, aucun ratio statistique existe
Quelle est la cause de ce problème? You have chosen resources between &V1& and &V2& for selection. However, no valid master data c...
Cliquez sur ce lien pour rechercher tous les messages SAP.