How To Fix GM090 - Nature comptable primaire & ne peut être budgétée sur centre &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GM - Combination manager

  • Message number: 090

  • Message text: Nature comptable primaire & ne peut être budgétée sur centre &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The cost element &V1& you want to plan has a primary cost element type.
    The cost center &V2& to be planned is blocked against the planning of
    primary costs. This block was made in the master record of this cost
    center for period(s) &V3&.

    Comment corriger cette erreur?

    Either do not plan the cost center/cost element combination
    &V2&/&V1&, or
    Shorten the planning period so that cost center &V2& is open in the new
    period for primary cost planning, or
    Arrange for the block to be removed.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP GM090 - Nature comptable primaire & ne peut être budgétée sur centre & ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant