Message type: E = Error
Message class: GM - Combination manager
Message number: 044
Message text: Budgétisation secondaire non prévue sur le centre &
Cost center &V1& is blocked for secondary cost planning. The block was
set in the master record of this cost center for the period(s) &V2&.
Cost center &V1& is not included in plan assessment of plan distribution
for the period(s) &V2&.
If you want the cost center included in the plan assessment, you must
remove the block for the period.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
GM044
- Budgétisation secondaire non prévue sur le centre & ?Get instant SAP help. Sign up for our Free Essentials Plan.
GM043
Budgétisation primaire non prévue sur le centre &
Quelle est la cause de ce problème? Cost center &V1& is blocked for primary cost planning. The block was set in the master record of this c...
GM042
Nat. compt. & n'est pas une nat. compt. de répartition globale
Quelle est la cause de ce problème? You want to use the cost element &V1& for the assessment. This means that the cost element must be an ...
GM045
Comptabilisations primaires non prévues sur le centre &
Quelle est la cause de ce problème? Cost center &v1& is blocked for primary postings. The block was set in the master record of the cost ce...
GM046
Le ratio statistique & n'existe pas dans le périmètre analytique &
Quelle est la cause de ce problème? You want to use the statistical key figure &V2&. However, this has not yet been created in the controll...