Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GM044 - Budgétisation secondaire non prévue sur le centre &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GM - Combination manager

  • Message number: 044

  • Message text: Budgétisation secondaire non prévue sur le centre &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Cost center &V1& is blocked for secondary cost planning. The block was
    set in the master record of this cost center for the period(s) &V2&.

    Réponse du système

    Cost center &V1& is not included in plan assessment of plan distribution
    for the period(s) &V2&.

    Comment corriger cette erreur?

    If you want the cost center included in the plan assessment, you must
    remove the block for the period.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP GM044 - Budgétisation secondaire non prévue sur le centre & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author