Message type: E = Error
Message class: GM - Combination manager
Message number: 044
Message text: Budgétisation secondaire non prévue sur le centre &
Cost center &V1& is blocked for secondary cost planning. The block was
set in the master record of this cost center for the period(s) &V2&.
Cost center &V1& is not included in plan assessment of plan distribution
for the period(s) &V2&.
If you want the cost center included in the plan assessment, you must
remove the block for the period.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
GM043 Budgétisation primaire non prévue sur le centre &
Quelle est la cause de ce problème? Cost center &V1& is blocked for primary cost planning. The block was set in the master record of this c...
GM042 Nat. compt. & n'est pas une nat. compt. de répartition globale
Quelle est la cause de ce problème? You want to use the cost element &V1& for the assessment. This means that the cost element must be an ...
GM045 Comptabilisations primaires non prévues sur le centre &
Quelle est la cause de ce problème? Cost center &v1& is blocked for primary postings. The block was set in the master record of the cost ce...
GM046 Le ratio statistique & n'existe pas dans le périmètre analytique &
Quelle est la cause de ce problème? You want to use the statistical key figure &V2&. However, this has not yet been created in the controll...
Cliquez sur ce lien pour rechercher tous les messages SAP.