Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GM043 - Budgétisation primaire non prévue sur le centre &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GM - Combination manager

  • Message number: 043

  • Message text: Budgétisation primaire non prévue sur le centre &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Cost center &V1& is blocked for primary cost planning. The block was
    set in the master record of this cost center for the period(s) &V2&.

    Réponse du système

    Cost center &V1& is not included in planned distribution for the
    period(s) &V2&.

    Comment corriger cette erreur?

    If you want the cost center included in the planned distribution, you
    must cancel the block for the period.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP GM043 - Budgétisation primaire non prévue sur le centre & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant