Message type: E = Error
Message class: GM - Combination manager
Message number: 007
Message text: Budgétisation secondaire non prévue pour le centre de coûts &
You want to plan cost center &V1&, but it is blocked against secondary
cost planning. The block was set in the master record of this cost
center within period(s) &V2&.
Do not plan secondary costs for cost center &V1& at all
Shorten the planning period so that cost center &V1& is open for
secondary cost planning in the new period, or
Cancel the block
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
GM006 Budgétisation primaire non prévue sur l'ordre &
Quelle est la cause de ce problème? The status of an order decides which activities are allowed for it. In addition, you can enter a blocking group...
GM005 Budgétisation primaire non prévue pour le centre de coûts &
Quelle est la cause de ce problème? The cost center &V1& that you want to plan is blocked for primary cost planning. The block was set in ...
GM008 Budgétisation secondaire non prévue sur ordre &
Quelle est la cause de ce problème? The status of an order decides which activities are allowed. In addition, you can enter a blocking group that ...
GM009 Budgétisation des produits non prévue pour centre de coûts &
Quelle est la cause de ce problème? The cost center &V1& that you want to plan is blocked for revenue planning. The block was set in the ma...
Cliquez sur ce lien pour rechercher tous les messages SAP.