Message type: E = Error
Message class: FINS_FI_MPROJ - Mass Data Project
Message number: 081
Message text: Aucun traitement car package &1 de l'activité &2 non encore terminé
The project cockpit consists of both manual and non-manual activities,
which must be processed in a predefined sequence for all packages and
organizational units.
This means that all activities of the project cockpit have a fixed
processing order that is defined by their predecessor and successor
relationships.
If you need to perform a <LS>Reset</>, the reverse order of the
pre-defined activity sequence is relevant. To reset an activity, you
need to first reset each activity below this activity in the project
cockpit. Start with the last activity and proceed in reverse order to
the activity you want to reset.
Specifically, there is a special "clean-up"-package called &V1&, which
is created for all <LS>Reset</> runs. This package must be completed
first for activity &V2& before you can <LS>Reset</> the current
activity.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Make sure that package &V1& has already been completed for activity &V2&
. Afterwards<(>,<)> you can perform the <LS>Reset</> operation on the
current activity again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FINS_FI_MPROJ081
- Aucun traitement car package &1 de l'activité &2 non encore terminé ?Get instant SAP help. Start your 7-day free trial now.
FINS_FI_MPROJ080
Aucun(e) package/entité org. à traiter car activité &1 non encore traitée
Quelle est la cause de ce problème? The current operation has not yet been completed for activity &V1&. The project cockpit consists of bot...
FINS_FI_MPROJ079
Package/entité org. &1 non traité car traitement déjà terminé
Quelle est la cause de ce problème? Since the current operation was already completed for package / organizational unit &V1& for activity &...
FINS_FI_MPROJ082
Package &1 de l'activité &2 exclu car tous packages ne seront pas réinit.
Quelle est la cause de ce problème? Package &V1& can only be processed (in a final step) if all packages are reset after the current run ha...
FINS_FI_MPROJ083
Aucun traitement car activité suivante &1 n'est pas encore réinitialisée.
Quelle est la cause de ce problème? The <LS>Reset</> operation hasn't been performed for activity &V1&. The project cockpi...
Cliquez sur ce lien pour rechercher tous les messages SAP.