Do you have any question about this error?
Message type: E = Error
Message class: FINS_FI_MPROJ - Mass Data Project
Message number: 080
Message text: Aucun(e) package/entité org. à traiter car activité &1 non encore traitée
The current operation has not yet been completed for activity &V1&.
The project cockpit consists of both manual and non-manual activities,
which must be processed in a predefined sequence for all packages and
organizational units.
This means that all activities of the project cockpit have a fixed
processing order that is defined by their predecessor and successor
relationships.
For a normal activity run, it is required that the direct predecessor of
an activity has been completed for all relevant packages or
organizational units.
If you need to perform a <LS>Reset</>, the reverse order of the
pre-defined activity sequence is relevant. To reset an activity, you
need to first reset each activity below this activity in the project
cockpit. Start with the last activity and proceed in reverse order to
the activity you want to reset.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Make sure that the current operation has already been completed for
activity &V1&. Afterwards, you can perform the operation on the current
activity again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FINS_FI_MPROJ080
- Aucun(e) package/entité org. à traiter car activité &1 non encore traitée ?Get instant SAP help. Start your 7-day free trial now.
FINS_FI_MPROJ079
Package/entité org. &1 non traité car traitement déjà terminé
Quelle est la cause de ce problème? Since the current operation was already completed for package / organizational unit &V1& for activity &...
FINS_FI_MPROJ078
Package/entité org. &1 non traité en raison du statut actuel activité &2
Quelle est la cause de ce problème? The package / organizational unit &V1& was excluded from processing because the corresponding status of...
FINS_FI_MPROJ081
Aucun traitement car package &1 de l'activité &2 non encore terminé
Quelle est la cause de ce problème? The project cockpit consists of both manual and non-manual activities, which must be processed in a predefined ...
FINS_FI_MPROJ082
Package &1 de l'activité &2 exclu car tous packages ne seront pas réinit.
Quelle est la cause de ce problème? Package &V1& can only be processed (in a final step) if all packages are reset after the current run ha...