Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 499
Message text: Le CCR budgété de la période future &3 ne peut pas être repéré
In &v4&, the following occurred:
You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
for material &v1& in plant &v2& for the future posting period &v3&.
However, this standard cost estimate has the costing status KF (costed
with errors). This status does not allow marking.
First save a standard cost estimate for the future posting period &v3&
&v4& that has the status KA (costed without errors).
Then carry out marking again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK498 Le CCR budgété de la période future &3 a déjà été repéré
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &...
CK497 Le CCR budgété de la période future &3 a déjà été lancé
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &...
CK500 Le CCR budgété de la période &3 a déjà été lancé de façon erronée
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard co...
CK501 Pas de vue de CCR dans la fiche article. Repérage impossible
Quelle est la cause de ce problème? There is no costing view in the <DS:GLOS.material_master_record>material master record</>.Réponse ...
Cliquez sur ce lien pour rechercher tous les messages SAP.