Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CK499 - Le CCR budgété de la période future &3 ne peut pas être repéré


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 499

  • Message text: Le CCR budgété de la période future &3 ne peut pas être repéré

  • Show details Hide details
  • Quelle est la cause de ce problème?

    In &v4&, the following occurred:
    You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
    for material &v1& in plant &v2& for the future posting period &v3&.
    However, this standard cost estimate has the costing status KF (costed
    with errors). This status does not allow marking.

    Comment corriger cette erreur?

    First save a standard cost estimate for the future posting period &v3&
    &v4& that has the status KA (costed without errors).
    Then carry out marking again.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CK499 - Le CCR budgété de la période future &3 ne peut pas être repéré ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author