Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 499
Message text: Le CCR budgété de la période future &3 ne peut pas être repéré
In &v4&, the following occurred:
You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
for material &v1& in plant &v2& for the future posting period &v3&.
However, this standard cost estimate has the costing status KF (costed
with errors). This status does not allow marking.
First save a standard cost estimate for the future posting period &v3&
&v4& that has the status KA (costed without errors).
Then carry out marking again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CK499
- Le CCR budgété de la période future &3 ne peut pas être repéré ?Get instant SAP help. Sign up for our Free Essentials Plan.
CK498
Le CCR budgété de la période future &3 a déjà été repéré
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &...
CK497
Le CCR budgété de la période future &3 a déjà été lancé
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &...
CK500
Le CCR budgété de la période &3 a déjà été lancé de façon erronée
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard co...
CK501
Pas de vue de CCR dans la fiche article. Repérage impossible
Quelle est la cause de ce problème? There is no costing view in the <DS:GLOS.material_master_record>material master record</>.Réponse ...
Cliquez sur ce lien pour rechercher tous les messages SAP.