Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 497
Message text: Le CCR budgété de la période future &3 a déjà été lancé
In &v4& the following occurred:
You are attempting to mark the standard cost estimate for material &v1&
in plant &v2& for posting period &v3&. However, this standard cost
estimate has already been released.
Marking it is therefore not necessary and is cancelled by the system.
No further actions for marking the standard cost estimate for material
&v1& in plant &v2& are required.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK496 Il n'existe pas de CCR budgété dans la période compt. &3
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark a standard cost estimate for material &v...
CK495 &1: type de devise &2 non géré dans le ledger article
Quelle est la cause de ce problème? &v1&: Currency type &v2& was not entered in the material ledger.Réponse du système The futur...
CK498 Le CCR budgété de la période future &3 a déjà été repéré
Quelle est la cause de ce problème? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &...
CK499 Le CCR budgété de la période future &3 ne peut pas être repéré
Quelle est la cause de ce problème? In &v4&, the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard c...
Cliquez sur ce lien pour rechercher tous les messages SAP.