How To Fix CC253 - Numéro de modification & déjà validé pour la fabrication


CC253 - Overview

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 253

  • Message text: Numéro de modification & déjà validé pour la fabrication

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You want to process a change object (for example, BOM) with reference
    to the change master record &V1&. A <DS:DE.CC_RLKEY>release key</> has
    been maintained for this change master record.

    Réponse du système

    The system checks the release key For the change master record. A
    release key that is released globally has been set for change master
    record 6V1&.

    Comment corriger cette erreur?

    You can do one of the following two things:
    If you want to process the change object with refernce to the change
    number &V1&, you must process the change master record first. Set a
    release key that is not defined as released.
    Choose a change number with a release key that is not defined as
    released.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


CC253 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author