How To Fix CC251 - Impossible de valider l'ordre de modification & pour la fabrication


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 251

  • Message text: Impossible de valider l'ordre de modification & pour la fabrication

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You want to set a release key for an ECO and it has been defined as
    globally released.

    Réponse du système

    The system checks the system status of the ECO. You can only set the
    release key if the <LS>ECO released</> system status is set for the
    ECO.

    Comment corriger cette erreur?

    Check the system status of the ECO (in the change header).
    If required, set the system status to <LS>ECO released</>.
    If you cannot yet set this system status for the ECO, you first have to
    process the system status of the allocated change objects.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CC251 - Impossible de valider l'ordre de modification & pour la fabrication ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author