Do you have any question about this error?
Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 525
Message text: Pour la mesure &, il existe déjà cycles adaptation & &
You want to carry out a rent adjustment based on the construction
measure &V1&. The adjustment run &V2 &V3&, however, has already been
generated for this measure.
Since you can only use a construction measure once to perform a rent
adjustment, you cannot create another run.
However, you can update an existing run if it was generated on the
basis of planning data and if the actual data was maintained
subsequently for the construction measure. In this case, please use the
same adjustment run identification (that is, &V2&, &V3&).
If the run was already generated based on the actual data, you must
cancel it first before you can use the measure again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
6A525
- Pour la mesure &, il existe déjà cycles adaptation & & ?Get instant SAP help. Start your 7-day free trial now.
6A524
Don. réelles mesures modern. "&" identiques, nouv. calc. inutile
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
6A523
Aucun cycle d'adaptation pour la mesure modernisation "&"
Quelle est la cause de ce problème? Having changed the actual data for construction measure "&v1&", you now want to update the re...
6A526
Cycle de révision existant & & est actualisé
Quelle est la cause de ce problème? You want to carry out a rent adjustment run on the basis of a construction measure. An adjustment run with the ...
6A527
Cycle de révision existant & & non modifiable
Quelle est la cause de ce problème? You want to perform a rent adjustment on the basis of a construction measure using the identification &V1&a...
Cliquez sur ce lien pour rechercher tous les messages SAP.