Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 080
Message text: Fin per.lectura (&2) de &1 es sólo &3 día(s) antes fin per.cálculo &4
The end of the meter reading period of the meter reading unit is only a
few days before the end of the billing period for the corresponding
portion.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
If the interval between meter reading and billing is too short,
organizational problems may arise in the utility company. The interval
must be at least one day if the dataset is to be consistent.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
TU080
- Fin per.lectura (&2) de &1 es sólo &3 día(s) antes fin per.cálculo &4 ?Get instant SAP help. Start your 7-day free trial now.
TU079
Genere primero registros de fechas planificadas de porción
¿Qué causa este problema? Schedule records for meter reading units can only be generated if schedule records have been generated for the correspond...
TU078
No se puede crear pl.cuot.fij.p.contrato &1 (fin período &2 (porción &3))
¿Qué causa este problema? A period for the budget billing plan is determined using the move-in date or the entry date. In structuring the the budge...
TU081
Combinación cl.cálculo/tp.sector &1 &2 no creada en unidad lectura &3
¿Qué causa este problema? You have entered a combination of billing class and division category that does not exist in the meter reading unit.Respu...
TU082
La porción &1 aún se utiliza en la unidad de lectura &2
¿Qué causa este problema? You have attempted to delete the portion. This is not possible because the portion is still used in meter reading units.R...
Haga clic en este enlace para buscar todos los mensajes de SAP.