Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 078
Message text: No se puede crear pl.cuot.fij.p.contrato &1 (fin período &2 (porción &3))
A period for the budget billing plan is determined using the move-in
date or the entry date. In structuring the the budget billing plan it
was determined that no further open due dates can be requested (end of
period already reached). For this reason no budget billing plan created
for this period.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Please select a current period by changing the date. The current period
for this contract can be determined using the portion.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
TU078
- No se puede crear pl.cuot.fij.p.contrato &1 (fin período &2 (porción &3)) ?Get instant SAP help. Start your 7-day free trial now.
TU077
No ha rellenado el parámetro de tabla &1 del módulo de funciones &2
¿Qué causa este problema? The table parameter for the function module has not been filled. One table must be filled (at least with contracts) for t...
TU076
Para la fecha existen ya tod.planes cuot.fij.p.tod.contratos cliente &1
¿Qué causa este problema? No contract was found for the customer for which a budget billing plan could be created using this selection date. El sis...
TU079
Genere primero registros de fechas planificadas de porción
¿Qué causa este problema? Schedule records for meter reading units can only be generated if schedule records have been generated for the correspond...
TU080
Fin per.lectura (&2) de &1 es sólo &3 día(s) antes fin per.cálculo &4
¿Qué causa este problema? The end of the meter reading period of the meter reading unit is only a few days before the end of the billing period for...
Haga clic en este enlace para buscar todos los mensajes de SAP.