Do you have any question about this error?
Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 038
Message text: Componente asignado a actividad sin punto de referencia
Why is it relevant
The advantage of using reference points is that you do not have to
manually assign BOM items to network activities in BOM transfer.
Possible Reasons
You manually assigned the BOM item to a network activity or (future) you
created the network directly from the BOM.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Fix
If you intend to copy networks, you should consider using reference
points to avoid having to assign BOM items manually for every end-item
unit
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MPE_INSTALLATION_MSG038
- Componente asignado a actividad sin punto de referencia ?Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG037
La actividad referenciada no existe
¿Qué causa este problema? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence ...
MPE_INSTALLATION_MSG036
Componente no asignado a la actividad
¿Qué causa este problema? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence ...
MPE_INSTALLATION_MSG039
Componente asignado a la actividad con un punto de referencia incorrecto
¿Qué causa este problema? Why is it relevant? Reference points serve the assignment of BOM items to network activities. The component demand (reser...
MPE_INSTALLATION_MSG040
La duración de actividad de grafo & y el maestro de materiales & difiere
¿Qué causa este problema? The network and material master have been created independently.Respuesta del sistema This app allows to create network ...
Haga clic en este enlace para buscar todos los mensajes de SAP.