Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 035
Message text: Componente asignado a la actividad con un punto de referencia incorrecto
One of the following applies:
The production engineer manually assigned the component to an
individually selected network activity in the BOM transfer (transaction
CN33_N).
The reference point in the network activity was changed after the BOM
transfer.
The reference point in the BOM item was changed after the BOM transfer.
Reference points are used to assign BOM items to network activities. The
component demand (reservation) is assigned to a different network
activity than defined by the reference points.
You have the following options:
Accept the warning.
Change the reference point either in the BOM item or network activity
(using the <LS>Maintain Bill of Material</> app with the item selected
or transaction <AB>CJ20N</> with the network activity selected).
Subsequently re-explode the current BOM version.
Assign the component to a different network activity by re-exploding the
current BOM version.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MPE_INSTALLATION_MSG035
- Componente asignado a la actividad con un punto de referencia incorrecto ?Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG034
Componente asignado a actividad sin punto de referencia
¿Qué causa este problema? You manually assigned the BOM item to a network activity or you created the network directly from the BOM.Respuesta del s...
MPE_INSTALLATION_MSG033
La actividad referenciada no existe
¿Qué causa este problema? A component demand or reservation references a network activity that does not exist.Respuesta del sistema Every demand f...
MPE_INSTALLATION_MSG036
Componente no asignado a la actividad
¿Qué causa este problema? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence ...
MPE_INSTALLATION_MSG037
La actividad referenciada no existe
¿Qué causa este problema? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence ...
Haga clic en este enlace para buscar todos los mensajes de SAP.