Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 405
Message text: &1: &2 (N3)
In the MRP list, this exception message displays
that the order proposal was newly created in the last planning run
that the start date of teh order proposal lies in the past
This situation may occur if automatic forward scheduling in the
planning run has been switched off in Customizing for the plant in
question or if when adjusting the start date when scheduling the
routing, the start date is moved into the past.
Check whether the order proposal is to be rescheduled.
If the start date moved into the past after scheduling the routing, you
should check whether the in-house production time in the material
master record and the times in the routing are consistent.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MD405
- &1: &2 (N3) ?Get instant SAP help. Start your 7-day free trial now.
MD404
&1: &2 (N2)
¿Qué causa este problema? In the MRP list, this exception message displays: that the planned order was newly created in the last planning run that ...
MD403
&1: &2 (N1)
¿Qué causa este problema? In the MRP list, this exception message displays that the order proposal was newly created in the last planning run.Extra...
MD406
&1: &2 (N4)
¿Qué causa este problema? In the MRP list, this exception message displays, that the order proposal was newly created in the last planning run that...
MD407
&1: &2 (S1)
¿Qué causa este problema? No BOM exists for the material or for the sales order for the process with sales order BOM.Respuesta del sistema BOM exp...
Haga clic en este enlace para buscar todos los mensajes de SAP.