Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 204
Message text: La versión & está definida en la sociedad CO & como versión delta
Your given version &V1& is defined as a delta version in controlling
area &V2&, meaning the verion is based on a reference version. In CO
area &V2&, the Activity Based Costing component (CO-OM-ABC) is defined
as an <ZH>operational</> component. However, delta versions are used
only in <ZH>parallel</> Activity Based Costing.
Therefore, your version cannot be used for operational Activity Based
Costing in this controlling area.
The planning session cannot be completed.
Use a valid verion, not a delta version, in teh controlling area. If
necessary, change the given version by deactivating the "Reference
version" indicator in version maintenance.
If you have no valid versions for the controlling area, you must create
one.
To carry out parallel Activity Based Costing, you must activate the
corresponding indicator in the Activity Based Costing component.
&FURTHER_HINTS&
Version 000 is always valid for operational Activity Based Costing.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KW204
- La versión & está definida en la sociedad CO & como versión delta ?Get instant SAP help. Start your 7-day free trial now.
KW203
No existe el registro maestro referente a la cl.de ctes.de imputación &
¿Qué causa este problema? The master data of business process <ZH>&V2&</> includes allocation cost element <ZH>&V1&am...
KW202
Componente contabilidad de costes por procesos inactivo
¿Qué causa este problema? Activity-Based Costing (CO-ABC) is inactive for controlling area &V1&, fiscal year &V2&.Respuesta del sis...
KW205
El proceso & no está previsto para el ejercicio &
¿Qué causa este problema? You want to plan business process &V1& in fiscal year &V2&. However, the business process does not exist ...
KW206
Planificación de ctd.y tarifas no está prevista para proc.empresarial "&"
¿Qué causa este problema? Business process &V1& cannot be used for quantity and price planning.Respuesta del sistema You cannot plan proce...
Haga clic en este enlace para buscar todos los mensajes de SAP.