Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 254
Message text: No se han contabilizado actividades.
No activity consumption was posted in controlling area &V1& in fiscal
year &V2&.
Actual prices cannot be calculated for activity quantities or process
quantities that do not exist. The system cannot therefore calculate
activity prices.
Post activity consumption in controlling area &V1&.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KP254
- No se han contabilizado actividades. ?Get instant SAP help. Start your 7-day free trial now.
KP253
CeCo & clase de actividad &: Refer. actividad en actividad 0.
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...
KP252
CeCo & clase de actividad &: Refer. actividad en actividad 0.
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Respu...
KP255
El esquema de elementos no existe para la iteración de componentes.
¿Qué causa este problema? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost co...
KP256
El esquema de elementos no está activo para la iteración de componentes.
¿Qué causa este problema? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost co...