Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 255
Message text: El esquema de elementos no existe para la iteración de componentes.
Price calculation, according to the entry in version &V2&, should be
carried out with component layering (cost component layout &V1&).
However, the layout does not exist.
Price calculation proceeds without component layering.
Check the cost component layout stored in the version, and create one
if necessary.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KP255
- El esquema de elementos no existe para la iteración de componentes. ?Get instant SAP help. Start your 7-day free trial now.
KP254
No se han contabilizado actividades.
¿Qué causa este problema? No activity consumption was posted in controlling area &V1& in fiscal year &V2&.Respuesta del sistema Ac...
KP253
CeCo & clase de actividad &: Refer. actividad en actividad 0.
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...
KP256
El esquema de elementos no está activo para la iteración de componentes.
¿Qué causa este problema? Price calculation, according to the entry in version &V2&, should be carried out with component layering (cost co...
KP259
No se ha previsto una determinación de tarifas reales
¿Qué causa este problema? Plan activity prices are used for all actual allocations in controlling area &V1&, fiscal year &V2&, vers...
Haga clic en este enlace para buscar todos los mensajes de SAP.