Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 250
Message text: CeCo & clase de actividad &: Costes a pesar de actividad 0.
The plan or actual activity for cost center &V1&, activity type &V2& is
0. However, costs were planned or posted in period(s) &V3&.
The SAP System cannot calculate activity prices for this activity type
as this would involve division by zero. The plan or actual costs are
ignored in activity price calculation.
Check activity price calculation in planning for activity type &V2& in
cost center &V1& and the costs planned for period(s) &V3&.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP06>Primary Cost Planning</>
For activity price calculation in actual, actual costs are allocated
onto the activity type through splitting, although no activity posting
was made on this activity type.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KP250
- CeCo & clase de actividad &: Costes a pesar de actividad 0. ?Get instant SAP help. Start your 7-day free trial now.
KP249
Las opciones para &2 se han grabado
¿Qué causa este problema? Your settings for &V2& have been saved for controlling area &V1&.Respuesta del sistema When carrying out...
KP248
La actualización no se inicia debido a un error.
¿Qué causa este problema? A serious error occurred during processing.Respuesta del sistema Processing is continued as far as possible. However, th...
KP251
CeCo & clase de actividad &: Costes a pesar de actividad 0.
¿Qué causa este problema? The plan and posted activity for cost center &V1&, activity type &V2& is 0. However, costs were planned o...
KP252
CeCo & clase de actividad &: Refer. actividad en actividad 0.
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Respu...
Haga clic en este enlace para buscar todos los mensajes de SAP.