Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 251
Message text: CeCo & clase de actividad &: Costes a pesar de actividad 0.
The plan and posted activity for cost center &V1&, activity type &V2&
is 0. However, costs were planned or posted.
The SAP System cannot calculate activity prices as this would involve
division by zero. The plan costs are ignored in activity price
calculation.
Check plan activity price planning for activity type &V2&, cost center
&V1&, period(s) &V3&, and costs planned on the cost center.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP17>Primary Cost Planning</>
For actual activity price calculation, actual costs are allocated onto
the activity type by splitting, although no actual activity posting has
been made to this activity type.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KP251
- CeCo & clase de actividad &: Costes a pesar de actividad 0. ?Get instant SAP help. Start your 7-day free trial now.
KP250
CeCo & clase de actividad &: Costes a pesar de actividad 0.
¿Qué causa este problema? The plan or actual activity for cost center &V1&, activity type &V2& is 0. However, costs were planned or...
KP249
Las opciones para &2 se han grabado
¿Qué causa este problema? Your settings for &V2& have been saved for controlling area &V1&.Respuesta del sistema When carrying out...
KP252
CeCo & clase de actividad &: Refer. actividad en actividad 0.
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Respu...
KP253
CeCo & clase de actividad &: Refer. actividad en actividad 0.
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...
Haga clic en este enlace para buscar todos los mensajes de SAP.