Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 095
Message text: Error al implementar BAdI; período del componente del coste no válido
The derived and additional cost items were changed in an implementation
of the BAdI HRHCP00_DERIVE_VALU with the method
CHANGE_DERIVED_COSTITEMS. The return table contains cost items whose
period exceeds the validity of the object. The cost object is valid
from &V3& to &V4&, but a cost item exists that is valid from &V1& to
&V2&.
The system does not process these cost items any further.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Check the BAdI implementation.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
HRHCP00_PLAN094
Error al implementar BAdI; períodos solapados
¿Qué causa este problema? You have used the method &V1& of BAdI HRHCP00_DERIVE_VALU to determine the organizational grouping of cost object...
HRHCP00_PLAN093
Error al implementar el BAdI; períodos discontinuos
¿Qué causa este problema? In the enhancement (BAdI) HRHCP00_POST_PERIODS the posting periods have been changed. Since this change the posting perio...
HRHCP00_PLAN096
Error al implementar BAdI; asignación falsa a imputación diferente
¿Qué causa este problema? The derived and additional cost items were changed in an implementation of the BAdI HRHCP00_DERIVE_VALU with the method C...
HRHCP00_PLAN097
Error al implementar BAdI; período no válido
¿Qué causa este problema? The object selection for the planning run was changed in an implementation of the BAdI HRHCP00_RUN_OBJSEL. The return tab...
Haga clic en este enlace para buscar todos los mensajes de SAP.