Do you have any question about this error?
Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 094
Message text: Error al implementar BAdI; períodos solapados
You have used the method &V1& of BAdI HRHCP00_DERIVE_VALU to determine
the organizational grouping of cost objects. The resulting table
contains overlapping entries for the object &V4&, so that for the
period &V2& to &V3& the system cannot determine a unique value for the
organizational grouping.
The system does not perform a valuation.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Check the BAdI implementation.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
HRHCP00_PLAN094
- Error al implementar BAdI; períodos solapados ?Get instant SAP help. Start your 7-day free trial now.
HRHCP00_PLAN093
Error al implementar el BAdI; períodos discontinuos
¿Qué causa este problema? In the enhancement (BAdI) HRHCP00_POST_PERIODS the posting periods have been changed. Since this change the posting perio...
HRHCP00_PLAN092
Error al implementar el BAdI; ningún período para fecha final del plan
¿Qué causa este problema? In the enhancement (BAdI) HRHCP00_POST_PERIODS the posting periods have been changed. Since this change no posting period...
HRHCP00_PLAN095
Error al implementar BAdI; período del componente del coste no válido
¿Qué causa este problema? The derived and additional cost items were changed in an implementation of the BAdI HRHCP00_DERIVE_VALU with the method C...
HRHCP00_PLAN096
Error al implementar BAdI; asignación falsa a imputación diferente
¿Qué causa este problema? The derived and additional cost items were changed in an implementation of the BAdI HRHCP00_DERIVE_VALU with the method C...
Haga clic en este enlace para buscar todos los mensajes de SAP.