Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 012
Message text: Existen modificacionelibro &1, opción: "&2"
The current configuration settings of all ledgers, which are assigned to
the project<(>,<)> have been compared with a snapshot of these settings
that was taken at the time when preparations were completed.
If differences in project ledgers are found when you try to complete the
project, the system displays these differences.
In this case, a difference was found for ledger &V1& in setting: "&V2&"
(&V3&). The technical fieldname in the ledger table is "&V4&".
In general, subsequent configuration changes are not allowed and cannot
be handled properly during data processing. As a result, the current
data of ledger &V1& might be inconsistent.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
In non-production systems, you can reset the data in the project cockpit
first and then reset <LS>Complete Preparations</>. In this way, the
snapshot of the project configuration settings is updated the next time
you perform the <LS>Complete Preparations</> step.
Alternatively, you can change the message type (and even suppress the
message) in
<DS:TRAN.OBA5>Change Message Control</> using the application area
FINS_IC_CUST and message = 012.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FINS_IC_CUST012
- Existen modificacionelibro &1, opción: "&2" ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST011
Falta entrada de Customizing para libro &1, sociedad &2
¿Qué causa este problema? The configuration settings of the current project were changed after the preparation phase of the project was completed. ...
FINS_IC_CUST010
Existen modificaciones en atributo "&1" de ledger &2, sociedad &3
¿Qué causa este problema? The project configuration changed after the preparation phase of the project was completed. If you make any changes to th...
FINS_IC_CUST013
Existen modificaciones relativas a libro &1, sociedad &2
¿Qué causa este problema? The ledger settings were changed after the preparation phase of the current project was completed. Differences were found...
FINS_IC_CUST014
Falta cuenta p.categoría corrección "&1" (sociedad: &2/plan cuentas: &3)
¿Qué causa este problema? For company code &V2&, the adjustment category "&V1&" in chart of accounts &V3& is miss...
Haga clic en este enlace para buscar todos los mensajes de SAP.