Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 010
Message text: Existen modificaciones en atributo "&1" de ledger &2, sociedad &3
The project configuration changed after the preparation phase of the
project was completed.
If you make any changes to the project configuration after the project
preparations status has been set to completed, problems could occur in
the subsequent data processing steps.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
The changes were found in attribute &V1& for ledger &V2& and company
code &V3& of the current project &V4&.
You may have to contact the person responsible for the project or your
system administrator.
You can change the type of this message in test systems (for message
area = <AB>FINS_IC_CUST</>, message number = 010) using transaction
<DS:TRAN.OBA5>Message Control by the User</>.
If the message type is I (Info), S (Success), or W (Warning), it is
possible to proceed with the current action in a test system.
Note: This function is only supported in non-production systems.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FINS_IC_CUST010
- Existen modificaciones en atributo "&1" de ledger &2, sociedad &3 ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST009
En FI-AA, falta el arrastre de saldos para sociedad en ejercicio &1.
¿Qué causa este problema? In FI-AA, the balance carryforward for company code &V2& into fiscal year &V1& hasn't been run. Howe...
FINS_IC_CUST008
No se ha cerrado el ejercicio &1 para la sociedad &2 en FI-AA
¿Qué causa este problema? In FI-AA the fiscal year &V1& has not yet been closed for company code &V2&. Therefore, you cannot procee...
FINS_IC_CUST011
Falta entrada de Customizing para libro &1, sociedad &2
¿Qué causa este problema? The configuration settings of the current project were changed after the preparation phase of the project was completed. ...
FINS_IC_CUST012
Existen modificacionelibro &1, opción: "&2"
¿Qué causa este problema? The current configuration settings of all ledgers, which are assigned to the project<(>,<)> have been compare...
Haga clic en este enlace para buscar todos los mensajes de SAP.