How To Fix FARR_INFLIGHT_CHECK052 - C26: Imp.partic.prospectiva incons.pos.def.p.obl.prest.&1 en contrato &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_INFLIGHT_CHECK -

  • Message number: 052

  • Message text: C26: Imp.partic.prospectiva incons.pos.def.p.obl.prest.&1 en contrato &2

  • Show details Hide details
  • ¿Qué causa este problema?

    Contract change can either be:
    Contract modification
    Change of estimates.
    Depending on the Customizing (
    <DS:SIMG.FARR_VC_ACCT_PR>Configure Accounting Principle-specific
    Settings</>) for a company code and accounting principle, one or the
    other is applied when the scope of a contract is changed.
    The change mode for a POB is determined by the field CHANGE_MODE (only
    in the buffer, not written to database) and can be one of the following:
    'P' or 'V' prospective change
    'R' retrospective change
    ' ' (empty) no change
    Prospective change
    In case of a prospective change the system performs a prospective split
    on the deferral items. The deferral item which corresponds to an open
    reconciliation key in the period of the contract change is flaged with
    the prospective split flag (PRO_SPLIT = 'X').
    The split amount, that represents the revenue amount posted in periods
    prior to the current change, is stored on all deferral items beginning
    from the period in which the contract change was performed.
    The example below illustrates this:
    RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_QTY_DELTA,,REV_QTY_POSTED,,
    PRO_QTY_CUMULATE,,HAS_PRO_SPLIT,,LATEST_DEFITEM
    201802001,,POB1,,PR00,,1000.00,,0.00,,0.00,,-,,-
    201803001,,POB1,,PR00,,1000.00,,1000.00,,0.00,,-,,-
    201803002,,POB1,,PR00,,- 500.00,,1000.00,,1000.00,,X,,-
    201804001,,POB1,,PR00,,1000.00,, 500.00,,1000.00,,-,,-
    201805001,,POB1,,PR00,,1000.00,,1500.00,,1000.00,,-,,X
    In this example, a contract modification was performed in period
    2018/03. Therefore the split amount is calculated and the prospective
    split flag set. All deferral items, beginning from the contract change
    period, are updated with the split amount (PRO_AMT_CUMULATE).
    If the split amount on the last deferral item in the contract change
    period (here 2018/03) deviates from the split amount on the latest
    deferral item, a C26 inflight check error is raised.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    Respuesta del sistema

    The RAI processing is stopped or the manual transaction from the UI is
    stopped.

    ¿Cómo arreglar este error?

    You can search for SAP notes related to inflight check C26 by using the
    terms FARR_INFLIGHT_CHECK and C26.
    You can also check if there is inconsistent data already in the system.

    Procedimiento para Administradoras de Sistemas


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP FARR_INFLIGHT_CHECK052 - C26: Imp.partic.prospectiva incons.pos.def.p.obl.prest.&1 en contrato &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker