Do you have any question about this error?
Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 050
Message text: C02: Precio TRX (pos.def.) &4 <> ingr.planif.&3 para cond. &2 para POB &1
The sum of DOC_AMT_CUMULATE and PRO_AMT_CUMULATE for latest deferral
items for a condition type is not equal to the sum of REV_AMT_DELTA for
the same condition type. This check is relevant for the following
performance obligations:
Time-based POB
Event-based POB with fully fulfilled status
Customer Invoice (CI) with value relevant and final invoice status
Example
There is a time-based POB with two condition types that spans three
periods. The revenue spreading is listed as follows:
Period ,,CONDITION_TYPE ,,DOC_AMT_CUMULATE ,,PRO_AMT_CUMULATE,,
REV_AMT_DELTA,,LATEST_DEFITEM,,
01 ,,PR00,,0.80,,0,,0.40,,,,
02,,PR00,,0.40,,0.40,,0.40,,,,
02 ,,CORR ,,-0.40,,0,,-0.40,,,,
03,,PR00,,0.40,,0.40,,0.40,,X,,
03 ,,CORR,,-0.40,,0,,-0.40,,X,,
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
<ZK>Sum revenue for the latest deferral items DOC_AMT_CUMULATE +The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP Notes related to Inflight Check C02 by using the
terms FARR_INFLIGHT_CHECK and C02.
You can check if there is inconsistent data already in the system.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FARR_INFLIGHT_CHECK050
- C02: Precio TRX (pos.def.) &4 <> ingr.planif.&3 para cond. &2 para POB &1 ?Get instant SAP help. Start your 7-day free trial now.
FARR_INFLIGHT_CHECK049
C03: No existe cumplimiento p.oblig.prest.bas.tiempo &2 en contrato &1
¿Qué causa este problema? A time-based performance obligation (POB) with a valid start date and either a valid end date or a duration must always h...
FARR_INFLIGHT_CHECK048
C09: Prc.trx &3 <> imp.de doc.orig.&4 p.obl.prest.&2 en contrato &1
¿Qué causa este problema? The total of DOC_AMT_CUMULATE in the deferral item buffer with the latest deferral item (LATEST_DEFITEM) on the main pric...
FARR_INFLIGHT_CHECK051
C26: Imp.partic.prospectiva inconsistente p.obl.prest.&1 en contrato &2
¿Qué causa este problema? Contract change can either be: ?Contract modification ?Change of estimates. El sistema emite un mensaje de error y no le ...
FARR_INFLIGHT_CHECK052
C26: Imp.partic.prospectiva incons.pos.def.p.obl.prest.&1 en contrato &2
¿Qué causa este problema? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR...
Haga clic en este enlace para buscar todos los mensajes de SAP.