Do you have any question about this error?
Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 047
Message text: C26: Cantidad partición incorrecta en part.period.p.POB &1 en contrato &2
Contract change can either be:
Contract modification
Change of estimates.
Depending on the Customizing (
<DS:SIMG.FARR_VC_ACCT_PR>Configure Accounting Principle-specific
Settings</>) for a company code and accounting principle, one or the
other is applied when the scope of a contract is changed.
The change mode for a POB is determined by the field CHANGE_MODE (only
in the buffer, not written to database) and can be one of the following:
'P' or 'V' prospective change
'R' retrospective change
' ' (empty) no change
Prospective change
In case of a prospective change the system performs a prospective split
on the deferral items. The deferral item which corresponds to an open
reconciliation key in the period of the contract change is flaged with
the prospective split flag (PRO_SPLIT = 'X').
The split quantity, that represents the revenue quantity posted in
periods prior to the current change, is stored on all deferral items
beginning from the period in which the contract change was performed.
The example below illustrates this:
RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_QTY_DELTA,,REV_QTY_POSTED,,
PRO_QTY_CUMULATE,,HAS_PRO_SPLIT,,LATEST_DEFITEM
201801001,,POB1,,PR00,,2,,0,,0,,-,,-
201802001,,POB1,,PR00,,2,,2,,0,,-,,-
201803001,,POB1,,PR00,,2,,4,,0,,-,,-
201803002,,POB1,,PR00,,2,,2,,4,,X,,-
201804001,,POB1,,PR00,,2,,4,,4,,-,,-
201805001,,POB1,,PR00,,2,,6,,4,,-,,X
In this example, a contract modification was performed in period
2018/03. Therefore the split quantity is calculated and the prospective
split flag set. All deferral items, beginning from the contract change
period, are updated with the split quantity (PRO_QTY_CUMULATE).
If the split quantity on the last deferral item in the contract change
period (here 2018/03) deviates from the split quantity on the latest
deferral item, a C26 inflight check error is raised.
The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP notes related to inflight check C26 by using the
terms FARR_INFLIGHT_CHECK and C26.
You can also check if there is inconsistent data already in the system.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FARR_INFLIGHT_CHECK047
- C26: Cantidad partición incorrecta en part.period.p.POB &1 en contrato &2 ?Get instant SAP help. Start your 7-day free trial now.
FARR_INFLIGHT_CHECK046
C26: Partida no periodif.c/partición prospectiva p.POB &1 en contrato &2
¿Qué causa este problema? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR...
FARR_INFLIGHT_CHECK045
C17: Importe acumulado incorrecto en part.periodif.p.POB &1 contrato &2
¿Qué causa este problema? The sum of the revenue quantity delta column on the deferral items in previous periods for this performance obligation is...
FARR_INFLIGHT_CHECK048
C09: Prc.trx &3 <> imp.de doc.orig.&4 p.obl.prest.&2 en contrato &1
¿Qué causa este problema? The total of DOC_AMT_CUMULATE in the deferral item buffer with the latest deferral item (LATEST_DEFITEM) on the main pric...
FARR_INFLIGHT_CHECK049
C03: No existe cumplimiento p.oblig.prest.bas.tiempo &2 en contrato &1
¿Qué causa este problema? A time-based performance obligation (POB) with a valid start date and either a valid end date or a duration must always h...
Haga clic en este enlace para buscar todos los mensajes de SAP.