Do you have any question about this error?
Message type: E = Error
Message class: FARR_INFLIGHT_CHECK -
Message number: 046
Message text: C26: Partida no periodif.c/partición prospectiva p.POB &1 en contrato &2
Contract change can either be:
Contract modification
Change of estimates.
Depending on the Customizing (
<DS:SIMG.FARR_VC_ACCT_PR>Configure Accounting Principle-specific
Settings</>) for a company code and accounting principle, one or the
other is applied when the scope of a contract is changed.
The change mode for a POB is determined by the field CHANGE_MODE (only
in the buffer, not written to database) and can be one of the following:
'P' or 'V' prospective change
'R' retrospective change
' ' (empty) no change
Prospective change
In case of a prospective change the system performs a prospective split
on the deferral items. The deferral item which corresponds to an open
reconciliation key in the period of the contract change is flaged with
the prospective split flag (PRO_SPLIT = 'X').
This flag must be set on at least one performance obligation in the
period of the contract change. If this flag is missing, a C26 inflight
check error will be raised.
Buffers checked:
POB data buffer: ,,MTS_POB_DATA_BUFFER
Change type data buffer: ,,MTS_CHANGE_TYPE_BUFFER
Latest deferral item data buffer: ,,MTS_DEFITEM_LATEST_NSTAT_PRICE
Deferral item data buffer: ,,MTS_DEFITEM_NSTAT_PRICE
Both deferral item data buffers only hold deferral items for
non-statistical price conditions.
The RAI processing is stopped or the manual transaction from the UI is
stopped.
You can search for SAP notes related to inflight check C26 by using the
terms FARR_INFLIGHT_CHECK and C26.
You can also check if there is inconsistent data already in the system.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FARR_INFLIGHT_CHECK046
- C26: Partida no periodif.c/partición prospectiva p.POB &1 en contrato &2 ?Get instant SAP help. Start your 7-day free trial now.
FARR_INFLIGHT_CHECK045
C17: Importe acumulado incorrecto en part.periodif.p.POB &1 contrato &2
¿Qué causa este problema? The sum of the revenue quantity delta column on the deferral items in previous periods for this performance obligation is...
FARR_INFLIGHT_CHECK044
C17: Cantidad acumulada incorrecta en part.periodif.p.POB &1 contr.&2
¿Qué causa este problema? The sum of the revenue amount delta column on the deferral items in previous periods for this performance obligation is n...
FARR_INFLIGHT_CHECK047
C26: Cantidad partición incorrecta en part.period.p.POB &1 en contrato &2
¿Qué causa este problema? Contract change can either be: Contract modification Change of estimates. Depending on the Customizing ( <DS:SIMG.FARR...
FARR_INFLIGHT_CHECK048
C09: Prc.trx &3 <> imp.de doc.orig.&4 p.obl.prest.&2 en contrato &1
¿Qué causa este problema? The total of DOC_AMT_CUMULATE in the deferral item buffer with the latest deferral item (LATEST_DEFITEM) on the main pric...
Haga clic en este enlace para buscar todos los mensajes de SAP.