How To Fix DPR_PROJECT033 - La clase de período de la distribución no puede estar en blanco


DPR_PROJECT033 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJECT - Development Projects: Messages for Projects

  • Message number: 033

  • Message text: La clase de período de la distribución no puede estar en blanco

  • Show details Hide details
  • ¿Qué causa este problema?

    The field for the period type of the distribution cannot be empty
    because at least one role exists in the project for whose role type the
    distribution of total demand is active (see Customizing for <LS>Project
    Management</> under <LS>Define Role Types</>).

    Respuesta del sistema

    The system does not allow you to delete the period type.

    ¿Cómo arreglar este error?

    You can only delete the period type if no roles with distribution exist
    in the project.
    To do this, you first have to delete the distributed values in all roles
    affected and their staffings and then set a role type in which the
    distribution of total demand is not active, for each role.

    Procedimiento para Administradoras de Sistemas

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP DPR_PROJECT033 - La clase de período de la distribución no puede estar en blanco ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author