Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 499
Message text: CC plan del período futuro &3 no puede ser marcado
In &v4&, the following occurred:
You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
for material &v1& in plant &v2& for the future posting period &v3&.
However, this standard cost estimate has the costing status KF (costed
with errors). This status does not allow marking.
First save a standard cost estimate for the future posting period &v3&
&v4& that has the status KA (costed without errors).
Then carry out marking again.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK499
- CC plan del período futuro &3 no puede ser marcado ?Get instant SAP help. Sign up for our Free Essentials Plan.
CK498
CC plan del período futuro &3 ya ha sido marcado
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& p...
CK497
CC plan del período futuro &3 ya ha sido liberado
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& i...
CK500
CC plan del período &3 ya ha sido liberado de forma incorrecta
¿Qué causa este problema? In &v4& the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard cost estimat...
CK501
En maestro de materiales no existe vista CC. No es posible marcar
¿Qué causa este problema? There is no costing view in the <DS:GLOS.material_master_record>material master record</>.Respuesta del siste...
Haga clic en este enlace para buscar todos los mensajes de SAP.