Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 499
Message text: CC plan del período futuro &3 no puede ser marcado
In &v4&, the following occurred:
You are attempting to <DS:GLOS.mark>mark</> the standard cost estimate
for material &v1& in plant &v2& for the future posting period &v3&.
However, this standard cost estimate has the costing status KF (costed
with errors). This status does not allow marking.
First save a standard cost estimate for the future posting period &v3&
&v4& that has the status KA (costed without errors).
Then carry out marking again.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK498 CC plan del período futuro &3 ya ha sido marcado
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& p...
CK497 CC plan del período futuro &3 ya ha sido liberado
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& i...
CK500 CC plan del período &3 ya ha sido liberado de forma incorrecta
¿Qué causa este problema? In &v4& the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard cost estimat...
CK501 En maestro de materiales no existe vista CC. No es posible marcar
¿Qué causa este problema? There is no costing view in the <DS:GLOS.material_master_record>material master record</>.Respuesta del siste...
Haga clic en este enlace para buscar todos los mensajes de SAP.