Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 497
Message text: CC plan del período futuro &3 ya ha sido liberado
In &v4& the following occurred:
You are attempting to mark the standard cost estimate for material &v1&
in plant &v2& for posting period &v3&. However, this standard cost
estimate has already been released.
Marking it is therefore not necessary and is cancelled by the system.
No further actions for marking the standard cost estimate for material
&v1& in plant &v2& are required.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK497
- CC plan del período futuro &3 ya ha sido liberado ?Get instant SAP help. Start your 7-day free trial now.
CK496
En el período contable &3 no existe ningún cálculo del coste plan
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark a standard cost estimate for material &v1& in ...
CK495
&1: el tipo de moneda &2 no se gestiona en el ledger de materiales
¿Qué causa este problema? &v1&: Currency type &v2& was not entered in the material ledger.Respuesta del sistema The future planned...
CK498
CC plan del período futuro &3 ya ha sido marcado
¿Qué causa este problema? In &v4& the following occurred: You are attempting to mark the standard cost estimate for material &v1& p...
CK499
CC plan del período futuro &3 no puede ser marcado
¿Qué causa este problema? In &v4&, the following occurred: You are attempting to <DS:GLOS.mark>mark</> the standard cost estima...
Haga clic en este enlace para buscar todos los mensajes de SAP.