Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: AP_COPY - Copying Function for Plan/Budget
Message number: 025
Message text: Orden &1: Presupuesto no listo p.entrada
The budget of order &V1& should be changed automatically.
However, the overall or annual budget of order &V1& is <ZH>not</> ready
for input if the corresponding manual budgeting function was being
used. Therefore the automatic change to the budget is also <ZH>not</>
possible.
The budget of order &V1& is not changed.
The reason the order budget is not ready for input is usually that a
program type for investment programs is entered in the budget profile
of the order. As a result, the order cannot be budgeted until it is
assigned to a program position of an investment program of this program
type.
Assign the order to an appropriate investment program position.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
AP_COPY024 Sólo permitida versión plan 0 p.cl.progr.&1
¿Qué causa este problema? You want to work with a plan version other than 0 for an investment program that has program type &V1&. However, ...
AP_COPY023 Año impte.corrección &1: &2 (&3)
¿Qué causa este problema? The consistency check discovered an error in annual value &V1&.Respuesta del sistema The system proposes an adju...
AP_COPY026 Proyecto &1: Presup.no listo p.entrada total o parcialmente
¿Qué causa este problema? The budget of project &V1& should be changed automatically. However, the overall or annual budget of one or all W...
AP_COPY027 Progr.invers.&1/&2, posición &3: Sobrepasado presup.total
¿Qué causa este problema? As a result of automatic budgeting of measures belonging to program position &V3& of investment program &V1&a...
Haga clic en este enlace para buscar todos los mensajes de SAP.