How To Fix 29083 - Status & no liberado para hojas de ruta


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 29 - Bills of Material

  • Message number: 083

  • Message text: Status & no liberado para hojas de ruta

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to allocate a material component to the selected operation.
    This is only possible if the BOM has a status for which the indicator
    <LS>Released for work scheduling</> is set in Customizing (BOM status).
    The BOM you want to allocate to the operation has status &V1&. The
    indicator is not defined for this status.

    ¿Cómo arreglar este error?

    You cannot allocate the operation to this BOM until:
    this BOM is given a status with the indicator <LS>Released for work
    scheduling</>
    the settings in Customizing (BOM status) are change to include this
    indicator for the selected status

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP 29083 - Status & no liberado para hojas de ruta ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant