How To Fix 29083 - Status & no liberado para hojas de ruta


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 29 - Bills of Material

  • Message number: 083

  • Message text: Status & no liberado para hojas de ruta

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to allocate a material component to the selected operation.
    This is only possible if the BOM has a status for which the indicator
    <LS>Released for work scheduling</> is set in Customizing (BOM status).
    The BOM you want to allocate to the operation has status &V1&. The
    indicator is not defined for this status.

    ¿Cómo arreglar este error?

    You cannot allocate the operation to this BOM until:
    this BOM is given a status with the indicator <LS>Released for work
    scheduling</>
    the settings in Customizing (BOM status) are change to include this
    indicator for the selected status

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP 29083 - Status & no liberado para hojas de ruta ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant