Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 082
Message text: El status de la lista-materiales no prevee asignaciones de operaciones
You want to allocate a material component to an operation in a routing.
This is only possible if the BOM has a status for which the indicator
<LS>Released for work scheduling</> is set in Customizing (BOM status).
The BOM you are editing does not have a status with this indicator.
You cannot allocate the material component to a routing until:
the BOM is given a status with the indicator <LS>Released for work
scheduling</>
the settings in Customizing (BOM status) are changed to include this
indicator for the selected status
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
29082
- El status de la lista-materiales no prevee asignaciones de operaciones ?Get instant SAP help. Start your 7-day free trial now.
29081
Ninguna posición marcada válida el &, no es posible asignar operación
¿Qué causa este problema? You want to change items on the <LS>valid-from</> date. You either entered this date directly on the initial ...
29080
Posición(es) marcadas no son válidas el &, no es posible asign-operación
¿Qué causa este problema? You want to change the item(s) on the <LS>valid-from</> date. You either entered this date directly on the in...
29083
Status & no liberado para hojas de ruta
¿Qué causa este problema? You want to allocate a material component to the selected operation. This is only possible if the BOM has a status for wh...
29084
No se puede visualizar la posición
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.