How To Fix 29082 - El status de la lista-materiales no prevee asignaciones de operaciones


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 29 - Bills of Material

  • Message number: 082

  • Message text: El status de la lista-materiales no prevee asignaciones de operaciones

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to allocate a material component to an operation in a routing.
    This is only possible if the BOM has a status for which the indicator
    <LS>Released for work scheduling</> is set in Customizing (BOM status).
    The BOM you are editing does not have a status with this indicator.

    ¿Cómo arreglar este error?

    You cannot allocate the material component to a routing until:
    the BOM is given a status with the indicator <LS>Released for work
    scheduling</>
    the settings in Customizing (BOM status) are changed to include this
    indicator for the selected status

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP 29082 - El status de la lista-materiales no prevee asignaciones de operaciones ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant