Do you have any question about this error?
Message type: E = Error
Message class: XC - Message Class for Core Interface
Message number: 167
Message text: &1: Sales scheduling agreement planned in another system
You have transferred a confirmation to the ERP system for sales
scheduling agreement item &V2& (material/plant combination is &V1&).
However, the system in which the sales scheduling agreement item should
be planned (according to the assigned integration model) is not the same
as the system in which the confirmation was generated.
The combination was supposed to be planned in system &V3&.
The confirmation was generated in system &V4&.
The confirmation cannot be adopted in the sales scheduling agreement
because of the inconsistency here.
Check the integration models and assign the material/plant combination
to the correct system.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
XC167
- &1: Sales scheduling agreement planned in another system ?The SAP error message XC167 indicates that there is a conflict with a sales scheduling agreement that is planned in another system. This typically occurs in environments where multiple systems are integrated, such as in a landscape with SAP ERP and SAP S/4HANA or when using different instances of SAP.
Cause:
The error arises when:
To resolve this error, you can take the following steps:
Check the Scheduling Agreement: Verify if the scheduling agreement is indeed being processed in another system. You can do this by checking the relevant transaction codes (like ME33L for display) in the system where the agreement is supposed to be.
Data Synchronization: Ensure that data synchronization between the systems is functioning correctly. If you are using middleware or integration tools, check their status and logs for any errors.
Lock Status: If the scheduling agreement is locked in another system, you may need to wait until the lock is released. You can check the lock status using transaction code SM12.
Consult with IT/Support Team: If you are unable to resolve the issue, consult with your IT or SAP support team. They may need to investigate the integration setup or check for any system errors.
Manual Intervention: If necessary, you may need to manually update or correct the scheduling agreement in the system where the error is occurring, ensuring that it aligns with the data in the other system.
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
XC166
&1: Sales scheduling agreement contained in several integration models
What causes this issue? You have transferred a confirmation to the ERP system for sales scheduling agreement item &V2& (material/plant combin...
XC165
&1: Sales scheduling agreement not contained in active integration model
What causes this issue? You have transferred a confirmation to the ERP system for sales scheduling agreement &V2& (material/plant combination...
XC168
Checkbox 'No Pur. Req. Creation from APO' is active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
XC170
Conversion of purch. req. to a sched. agreement sched. line not possible
What causes this issue? An internal error occurred.System Response The system terminates the operation.How to fix this error? Contact your system a...
Click on this link to search all SAP messages.