Message type: E = Error
Message class: XC - Message Class for Core Interface
Message number: 163
Message text: ISO code could not be determined for unit of quantity &1
For material &V2&, the base unit of measure &V1& was transferred from
SAP APO to the ERP system. However, this does not agree with the base
unit of measure for the material in the ERP system. In addition, an ISO
code could not be determined for this base unit of measure.
The system terminates the processing because it cannot determine a
correct base unit of measure.
Define the base units of measure and ISO codes in Customizing, or
correct the base units of measure in the material master.
Error message extract from SAP system. Copyright SAP SE.
XC163
- ISO code could not be determined for unit of quantity &1 ?The SAP error message XC163 indicates that the system is unable to determine the ISO code for a specific unit of quantity. This can occur in various scenarios, such as when creating or processing materials, sales orders, or other documents that involve units of measure.
Cause: Missing ISO Code: The unit of measure (UoM) being used does not have an associated ISO code in the system. Incorrect Configuration: The configuration for units of measure may not be set up correctly in the system. Custom Units: If a custom unit of measure is being used, it may not have been properly defined with an ISO code. Data Inconsistency: There may be inconsistencies in the master data related to units of measure.
Solution: Check Unit of Measure Configuration: Go to the transaction code CUNI (Maintain Units of Measure). Verify that the unit of measure in question is defined and has an associated ISO code. If it is missing, you can add the
Get instant SAP help. Sign up for our Free Essentials Plan.
XC162
Faulty base unit of quantity &1 for material &2
What causes this issue? For material &V2&, the base unit of quantity &V1& and the ISO code &V3& were transferred from SAP APO...
XC161
Subcontracting component with requirements quantity of zero
What causes this issue? A subcontracting order exists in SAP APO that contains components with a requirements quantity of zero. In the ERP system, it...
XC164
&1: Sales scheduling agreement also defined for system &2
What causes this issue? For the combination (material/plant) &V1& you have already defined in another model that the sales scheduling agreeme...
XC165
&1: Sales scheduling agreement not contained in active integration model
What causes this issue? You have transferred a confirmation to the ERP system for sales scheduling agreement &V2& (material/plant combination...
Click on this link to search all SAP messages.