Do you have any question about this error?
Message type: E = Error
Message class: XC - Message Class for Core Interface
Message number: 091
Message text: Planned order &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
XC091
- Planned order &1 ?The SAP error message XC091 typically indicates an issue with a planned order in the system. This message is often related to problems with the configuration or data associated with the planned order. Here’s a breakdown of the potential causes, solutions, and related information for this error:
Causes:
- Missing Master Data: The material master or BOM (Bill of Materials) may not be properly configured or may be missing.
- Capacity Issues: There may be insufficient capacity in the production resources or work centers.
- Scheduling Conflicts: The planned order may conflict with existing orders or production schedules.
- Incorrect Parameters: The planning parameters for the material may not be set correctly, leading to issues in order creation.
- Status Issues: The planned order may be in a status that does not allow for further processing.
Solutions:
Check Master Data:
- Verify that the material master data is complete and accurate.
- Ensure that the BOM is correctly defined and that all components are available.
Review Capacity Planning:
- Check the capacity of the work centers involved in the production process.
- Adjust the capacity or reschedule orders if necessary.
Analyze Scheduling:
- Look for any scheduling conflicts with existing production orders or planned orders.
- Adjust the scheduling parameters or reschedule the planned order.
Validate Planning Parameters:
- Review the planning parameters for the material in question.
- Make sure that the settings align with the production requirements.
Check Order Status:
- Ensure that the planned order is in a status that allows for processing.
- If necessary, change the status of the planned order.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
XC090
Method: &1 / material: &2 / plant: &3 / production version: &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
XC088
Object &1 currently locked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
XC092
Data selection was terminated
What causes this issue? The call of function module &V1& terminated with an error. The error message that was returned is '&V2&&...
XC093
Termination caused by customer exit &1
What causes this issue? Customer exit &V1& determined that the initial data transfer should be terminated.System Response The initial data t...
Click on this link to search all SAP messages.