Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 503
Message text: Control key &1 not relevant to scheduling or is a rework operation
The control key &V1& entered in the operation or the phase indicates
that the operation is not relevant to scheduling or is a rework
operation.
Operations/phases that are not relevant for scheduling, as well as
rework operations, are not transferred to the APO system.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
X4503
- Control key &1 not relevant to scheduling or is a rework operation ?The SAP error message X4503 indicates that the control key specified in the operation is not relevant for scheduling or is associated with a rework operation. This error typically arises in the context of production planning and control, particularly when dealing with routing and work center configurations.
Cause:
Control Key Configuration: The control key assigned to the operation in the routing may not be set up to allow scheduling. Control keys determine how operations are processed in production, including whether they can be scheduled, confirmed, or are subject to certain constraints.
Rework Operations: If the operation is marked as a rework operation, it may not be relevant for standard scheduling processes. Rework operations often have different handling in terms of planning and execution.
Routing Issues: The routing may not be correctly defined, or the control key may not be appropriate for the type of operation being performed.
Work Center Settings: The work center associated with the operation may have settings that do not allow for scheduling or may not be configured correctly.
Solution:
Check Control Key: Review the control key assigned to the operation in the routing. Ensure that it is set up to allow scheduling. You can do this by navigating to the control key configuration in the SAP system (Transaction code OPL8).
Modify Routing: If the control key is not appropriate, consider changing it to a control key that is relevant for scheduling. You can do this in the routing transaction (Transaction code CA01 or CA02).
Review Work Center: Check the settings of the work center associated with the operation. Ensure that it is configured to allow scheduling and that it is set up correctly for the type of operations you are performing.
Rework Operation Handling: If the operation is indeed a rework operation, ensure that it is being handled correctly in your production planning process. You may need to adjust your planning strategy or the way rework operations are defined in your system.
Consult Documentation: Refer to SAP documentation or help resources for more detailed information on control keys and their implications for scheduling.
Related Information:
Control Key Types: Common control keys include "PP01" (standard operation), "PP02" (rework), and others. Each control key has specific settings that dictate its behavior in production planning.
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address specific issues or bugs related to control keys and scheduling.
By following these steps, you should be able to resolve the X4503 error and ensure that your operations are correctly scheduled in SAP.
Get instant SAP help. Start your 7-day free trial now.
X4502
The work center &1 / plant &2 is not in the active integration model
What causes this issue? The work center of resource &V1& in plant &V2& does not exist in an active integration model or a work center...
X4501
Relationships for order &1 cannot be redirected
What causes this issue? In process order &V1& phases are missing for the transfer to APO. The system has attempted to divert the relationship...
X4504
Operation/phase with duration zero
What causes this issue? The operation or the phase has no duration.System Response Operations/phases that have no duration are not transferred to th...
X4505
Order &1: Operation/phase &2 is not APO relevant
What causes this issue? The operation or the phase &V2& of order &V1& is not relevant to APO.System Response The operation is not tr...