How To Fix WVLB023 - Only maintain the number of suppliers per process for parallel processing


WVLB023 - Overview

  • Message type: E = Error

  • Message class: WVLB - Messages for Load Building

  • Message number: 023

  • Message text: Only maintain the number of suppliers per process for parallel processing

  • Show details Hide details
  • What causes this issue?

    You have entered the number of vendors for each process (input value >
    0) in the technical controls without choosing parallel processing. As
    the input value only takes effect during parallel processing, the input
    value must be filled with 0 without parallel processing when the
    program is being executed.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Enter the value 0 (or leave the input field empty) for the number of
    recipients for each process.
    Start the program with the parallel processing switched on. This is,
    however, only possible by executing the program in the background.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WVLB023 - Only maintain the number of suppliers per process for parallel processing ?
    The SAP error message WVLB023 indicates that there is an issue with the configuration of the number of suppliers allowed for parallel processing in the system. This error typically arises when the number of suppliers defined for a particular process exceeds the allowed limit set in the system configuration.
    
    Cause: The error occurs when: The number of suppliers assigned to a specific process exceeds the maximum limit defined in the system settings for parallel processing. The configuration settings for parallel processing may not be aligned with the number of suppliers you are trying to process simultaneously.
    Solution: To resolve the error WVLB023, you can take the following steps: Check Configuration Settings: Navigate to the relevant configuration settings in SAP where the limits for parallel processing are defined. This is usually found in the customizing settings for the specific module you are working with (e.g., Materials Management, Supplier Relationship Management). Look for settings related to parallel processing and the maximum

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker