Message type: E = Error
Message class: WVLB - Messages for Load Building
Message number: 021
Message text: Int. program start and simultaneous parallel processing are not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WVLB021
- Int. program start and simultaneous parallel processing are not possible ?The SAP error message WVLB021 indicates that there is an issue with starting an internal program while simultaneous parallel processing is not allowed. This typically occurs in scenarios where a background job or a parallel processing request is being initiated, but the system settings or the current state of the job do not permit it.
Cause:
- Parallel Processing Restrictions: The system may be configured to restrict parallel processing for certain jobs or programs. This can be due to resource constraints or specific settings in the job definition.
- Job Already Running: If the job is already running in the background, attempting to start it again in parallel may trigger this error.
- Configuration Settings: The configuration settings for the specific program or transaction may not allow for parallel execution.
- Locking Mechanisms: There may be locking mechanisms in place that prevent the program from being executed in parallel.
Solution:
- Check Job Status: Verify if the job is already running. You can do this by checking the job overview in transaction SM37. If it is running, you may need to wait for it to complete.
- Review Job Configuration: Check the configuration of the job in transaction SM36. Ensure that the job is set up to allow parallel processing if that is required.
- Adjust Parallel Processing Settings: If you have the necessary authorizations, you can adjust the settings to allow for parallel processing. This may involve changing parameters in the job definition or the program itself.
- Consult Documentation: Review the documentation for the specific program or transaction to understand its requirements and limitations regarding parallel processing.
- Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the WVLB021 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
WVLB020
Multiple loads can only be built in simulation mode with planning cycle
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WVLB019
Select a valid restriction profile
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WVLB022
Parallel processing requires the number of suppliers for each process
What causes this issue? You have chosen parallel processing in the technical control without entering the number of vendors for each process (input v...
WVLB023
Only maintain the number of suppliers per process for parallel processing
What causes this issue? You have entered the number of vendors for each process (input value > 0) in the technical controls without choosing paral...
Click on this link to search all SAP messages.